https://www.facebook.com/groups/214671495248777/permalink/1433427466706501/
Blog
-
Monumental Day! First Ride
Today was a game changer. After the first four hours making exhaust and muffler, we had a runner.

Then the starting got easier and easier.
After this I took on a 1-1/2 mile ride. Wonderful!!
A few more things to attend to: oil venting pipe needs to be fabricated, muffler needs to be welded internally, and the rear brake needs some attention. But all in all a HUGE day!#9cannonball2018
#tribbeycannonball2018
-
Exhaust Pipe
-
Celebration Brew!
A very good friend of mine (Andrew, same guy who made the fantastic period correct workbench) worked with his neighbor Robert (brewmaster) to surprise me with this custom made beer! Andrew designed and had labels printed, and Robert did the magic with the beer recipe. After we started the bike on September 12th, we cracked open a few of these babies to celebrate! Thank you both, I am honored with this gesture.
The beer was FANTASTIC by the way! I wonder how long it will keep?

-
Wiring Finished.
Here is a video update on the wiring.
#tribbeycannonball2018
#9cannonball2018
-
First Start (another view)
Here is a link to another video of the first start. More work to do but a great incentive to know we have a running engine!









