This step has been one of the most daunting tasks I knew I had to tackle. If you are familiar with early Excelsior throttle and timer linkages you know what I mean. In essence there are many little rods and couplers that connect both twist grips to the carburetor and timer assembly. This bike is missing some and the rest were rust-welded together. Here are a few pictures of what I started with:

IMG_6445IMG_6447IMG_6448

 

So after soaking in Kroil for a few weeks, and every now and then tapping a little, I was able to loosen one nut on the right side inner handlebar pivot. Then I was able to separate the lever from the shaft.

IMG_8628

 

This left a nice perfect condition shaft that was still frozen solid on the handlebar. But more Kroil and heat and I was able to start to move it a little.

IMG_8632

 

The left side handlebar shaft did not have a nut or lever attached. So I cleaned up the threads and kept oiling the shaft.

IMG_8635

 

Back to the right side. After more finesse I was able to completely loosen and remove the shaft!

IMG_8639

 

PERFECT condition! Time to clean it up a bit. Happy days! One side down and one to go.

IMG_8640

 

 

One Reply to “Linkage anyone?”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: